MCLAREN ENGINEERING GROUP APPLIED INGENUITY - Trademark Details
Status: 700 - Registered
Serial Number
88280744
Registration Number
5839014
Word Mark
MCLAREN ENGINEERING GROUP APPLIED INGENUITY
Status
700 - Registered
Status Date
2019-08-20
Filing Date
2019-01-29
Registration Number
5839014
Registration Date
2019-08-20
Mark Drawing
3000 - Illustration: Drawing or design which also includes word(s)/ letter(s)/number(s)
Typeset
Design Searches
060701, 071101, 240907, 250301, 260112, 260121, 261121, 261702 - Cities from a distant perspective, skylines. Bridges. Banners. Checkerboard pattern. Circles with bars, bands and lines. Circles that are totally or partially shaded. Rectangles that are completely or partially shaded. Wavy line(s), band(s) or bar(s).
Published for Opposition Date
2019-06-04
Attorney Name
Law Office Assigned Location Code
N40
Employee Name
DANTZLER, LAUREN ALEXA
Statements
Indication of Colors claimed
Color is not claimed as a feature of the mark.
Disclaimer with Predetermined Text
"ENGINEERING GROUP"
Description of Mark
The mark consists of three rows of text. The top row of text, in the largest font size, reads "MCLAREN". The second row of text, in a smaller font size, reads "ENGINEERING GROUP". The third row of text, approximately equal in font size to the second row of text, reads "APPLIED INGENUITY" placed within a shaded rectangle. The three lines of text are justified to the right. To the left of the second and third rows of text is a shaded circle with an image of a city-scape and a bridge at the top of the circle and a checkboard and wavy line design on the bottom of the circle, which interrupts the continuity of the shaded rectangle.
Goods and Services
Engineering Services in the field of accident reconstruction, land title surveying, evaluating amusement rides and devices, preparing animations and pre-visualization studies of engineering projects, land boundary surveys, bridge collapse, bridge inspection, bridge construction and maintenance, building collapse, building construction and maintenance, bulkhead construction and maintenance, building code compliance and technical peer review, concrete construction and maintenance, construction failure analysis, corrosion investigations and mitigation design, crane installation, custom rigging design, curtain wall facade design, structure demolition and removal, underwater diving for inspection of structures or utilities, drainage studies, design and hydrology, entertainment venue and theater structural design and renovation, erosion control, analysis and design of tensile fabric roof structures, FEMA floodplain ordinance compliance, building elevation survey and certification, flood plain impact, foundations design, construction and maintenance, geotechnical and soil engineering, highway design, hydrographic surveys, light gage metal framing, machinery operation and implementation, marina design, construction and maintenance, marine borers operation and implementation, marine engineering, namely, the design of ports, terminals, piers, wharves, berthing, mooring, and fendering systems, bridges, dams, bulkheads and relieving platforms, marine facility design, construction and maintenance, construction material and system failure analysis, mechanized effects and entertainment equipment operation and implementation, pedestrian bridge construction and maintenance, pier design, construction and maintenance, precast concrete design, construction and maintenance, prestressed concrete design, construction and maintenance, structural design with recycled plastic lumber, retaining wall design, construction and maintenance, scenery/theming and touring stage design, construction and maintenance, seismic design, ship collision analysis, ship fendering, ship and cruise terminal design, construction and maintenance, private and public development site master planning and layout, stage equipment design, construction and maintenance, structural steel- and cold formed steel-framed building design, storm water management plans, material and component stress, fatigue failure analysis, condition assessment, review, analysis and retrofit of existing structures, assessment of structural failures, parcel subdivision and land development surveys, topographic and utility surveying, resolution of boundary disputes via survey, television and film production staging and stunt structural design, theatre design, construction and maintenance, themed architectural elements and sculpture design, construction and maintenance, timber structure design, construction and maintenance, topographic surveys, underwater inspection of marine and coastal structures, utilities design, wharf design, construction and maintenance
Classification Information
International Class
042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software; legal services. - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software; legal services.
US Class Codes
100, 101
Class Status Code
6 - Active
Class Status Date
2019-02-21
Primary Code
042
First Use Anywhere Date
2005-01-01
First Use In Commerce Date
2005-01-01
Current Trademark Owners
Party Name
Party Type
30 - Original Registrant
Legal Entity Type
03 - Corporation
Address
Please log in with your Justia account to see this address.
Trademark Owner History
Party Name
Party Type
30 - Original Registrant
Legal Entity Type
03 - Corporation
Address
Please log in with your Justia account to see this address.
Party Name
Party Type
20 - Owner at Publication
Legal Entity Type
03 - Corporation
Address
Please log in with your Justia account to see this address.
Party Name
Party Type
10 - Original Applicant
Legal Entity Type
03 - Corporation
Address
Please log in with your Justia account to see this address.
Correspondences
Name
DAVID CYKIERT
Address
Please log in with your Justia account to see this address.
Trademark Events
Event Date | Event Description |
2019-02-01 | NEW APPLICATION ENTERED IN TRAM |
2019-02-21 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |
2019-03-21 | NOTICE OF DESIGN SEARCH CODE E-MAILED |
2019-04-10 | ASSIGNED TO EXAMINER |
2019-04-10 | NON-FINAL ACTION WRITTEN |
2019-04-10 | NON-FINAL ACTION E-MAILED |
2019-04-10 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
2019-04-11 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
2019-04-11 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
2019-04-11 | TEAS/EMAIL CORRESPONDENCE ENTERED |
2019-04-17 | APPROVED FOR PUB - PRINCIPAL REGISTER |
2019-04-29 | ASSIGNED TO LIE |
2019-04-30 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
2019-05-15 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
2019-06-04 | PUBLISHED FOR OPPOSITION |
2019-06-04 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
2019-08-20 | REGISTERED-PRINCIPAL REGISTER |