EBA - Trademark Details
Status: 602 - Abandoned-Failure To Respond Or Late Response
Serial Number
85776137
Word Mark
EBA
Status
602 - Abandoned-Failure To Respond Or Late Response
Status Date
2013-10-17
Filing Date
2012-11-09
Mark Drawing
4000 - Standard character mark
Typeset
Attorney Name
Law Office Assigned Location Code
M70
Employee Name
SWAIN, MICHELE LYNN
Statements
Concurrent Use Statement
Concurrent use information. Applicant desires a concurrent use registration.
Goods and Services
TRANSPORTATION ENGINEERING; CIVIL ENGINEERING RELATING TO SITE EVALUATION AND FEASIBILITY STUDIES, SITE DEVELOPMENT PLANNING, STORM DRAIN AND STORM WATER MANAGEMENT SYSTEM STUDIES AND DESIGN, FLOOD PLAIN STUDIES, UTILITY SYSTEM PLANNING AND DESIGN, SEDIMENT CONTROL PLANS, SURVEYING AND MAPPING, AND WATER TREATMENT AND SEWAGE TREATMENT PLANT PLANNING, DESIGN AND ASSESSMENT; SOLID WASTE FACILITY PLANNING AND DESIGN; GEOTECHNICAL ENGINEERING; GEOTECHNICAL LABORATORY TESTING; CONSTRUCTION MANAGEMENT SERVICES; INSPECTION AND QUALITY CONTROL IN THE FIELD OF CONSTRUCTION; LABORATORY AND FIELD MATERIAL TESTING IN THE FIELD OF CONSTRUCTION; ENGINEERING SERVICES IN THE FIELDS OF ENVIRONMENTAL SCIENCE, ENVIRONMENTAL PLANNING AND DESIGN, ENVIRONMENTAL ASSESSMENT AND COMPLIANCE, INDUSTRIAL HYGIENE AND REMEDIATION
Classification Information
International Class
042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software; legal services. - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software; legal services.
US Class Codes
100, 101
Class Status Code
6 - Active
Class Status Date
2012-11-16
Primary Code
042
First Use Anywhere Date
1981-12-30
First Use In Commerce Date
1983-01-01
Correspondences
Name
VASILIOS PEROS
Address
Please log in with your Justia account to see this address.
Trademark Events
Event Date | Event Description |
2012-11-13 | NEW APPLICATION ENTERED IN TRAM |
2012-11-16 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |
2013-03-07 | ASSIGNED TO EXAMINER |
2013-03-11 | NON-FINAL ACTION WRITTEN |
2013-03-11 | NON-FINAL ACTION MAILED |
2013-10-17 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
2013-10-17 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND |