CRITICAL PATH E V M - Trademark Details
Status: 710 - Cancelled - Section 8
Serial Number
85332245
Registration Number
4077186
Word Mark
CRITICAL PATH E V M
Status
710 - Cancelled - Section 8
Status Date
2018-08-03
Filing Date
2011-05-27
Registration Number
4077186
Registration Date
2011-12-27
Mark Drawing
3000 - Illustration: Drawing or design which also includes word(s)/ letter(s)/number(s)
Typeset
Design Searches
200308, 261110, 261121 - Graph paper, diagrams, blueprints, the periodic table. Rectangles divided once into two sections. Rectangles that are completely or partially shaded.
Published for Opposition Date
2011-10-11
Law Office Assigned Location Code
L90
Employee Name
LATTUCA, FRANK J
Statements
Indication of Colors claimed
Color is not claimed as a feature of the mark.
Disclaimer with Predetermined Text
"CRITICAL PATH EVM"
Description of Mark
The mark consists of a rectangular box frames the following: on the left side of the large framing rectangular box is a square that is colored in completely; in the center is a contrasting lighter image. The image is a right angle that points towards the bottom right of the inner square. Three jagged lines progress from the left of the bottom line to the top of the upright line signifying a graph with three lines, each progressing upwards over the last. The right section has the words "Critical Path" on the top center and the letters "EVM" spread out beneath. The words are a darker contrast to the background.
Goods and Services
Computer software for Earned Value data graphing and reporting capabilities
Classification Information
International Class
009 - Scientific, nautical, surveying, electric, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin-operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire-extinguishing apparatus. - Scientific, nautical, surveying, electric, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin-operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire-extinguishing apparatus.
US Class Codes
021, 023, 026, 036, 038
Class Status Code
2 - Sec. 8 - Entire Registration
Class Status Date
2018-08-03
Primary Code
009
First Use Anywhere Date
2010-05-00
First Use In Commerce Date
2010-05-00
Correspondences
Name
VSD, LLC
Address
Please log in with your Justia account to see this address.
Trademark Events
Event Date | Event Description |
2011-05-31 | NEW APPLICATION ENTERED IN TRAM |
2011-06-02 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |
2011-06-03 | NOTICE OF DESIGN SEARCH CODE MAILED |
2011-08-03 | ASSIGNED TO EXAMINER |
2011-08-09 | NON-FINAL ACTION WRITTEN |
2011-08-09 | NON-FINAL ACTION E-MAILED |
2011-08-09 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
2011-09-01 | EXAMINERS AMENDMENT -WRITTEN |
2011-09-01 | EXAMINERS AMENDMENT E-MAILED |
2011-09-01 | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED |
2011-09-02 | ASSIGNED TO LIE |
2011-09-02 | EXAMINER'S AMENDMENT ENTERED |
2011-09-03 | APPROVED FOR PUB - PRINCIPAL REGISTER |
2011-09-03 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
2011-10-11 | PUBLISHED FOR OPPOSITION |
2011-10-11 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
2011-12-27 | REGISTERED-PRINCIPAL REGISTER |
2016-12-27 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED |
2018-08-03 | CANCELLED SEC. 8 (6-YR) |