TEPE BETOPAN - Trademark Details
Status: 686 - Published For Opposition
Serial Number
79303691
Word Mark
TEPE BETOPAN
Status
686 - Published For Opposition
Status Date
2021-11-30
Filing Date
2020-12-31
Mark Drawing
3000 - Illustration: Drawing or design which also includes word(s)/ letter(s)/number(s)
Typeset
Design Searches
070108, 260503, 260512, 260513, 261701, 261702, 261706 - Tents, canopies. Incomplete triangles (must have two angles). Triangles with bars, bands and lines. Two Triangles. Straight line(s), band(s) or bar(s). Wavy line(s), band(s) or bar(s). Diagonal line(s), band(s) or bar(s).
Published for Opposition Date
2021-11-30
Attorney Name
Law Office Assigned Location Code
M70
Employee Name
CIANCI, RYAN MICHAEL
Statements
Indication of Colors claimed
The color(s) grey, red and black is/are claimed as a feature of the mark.
Desription of the Colors Claimed
Three-quarters of the triangle shape (on the left hand side) is in grey and rest of the triangle is in black with two red stripes on the shape.
Description of Mark
The mark consists of a grey incomplete triangle. A black triangle appears at the lower-right portion of the incomplete triangle. Two red wavy lines appear between the grey and black triangles. The black wording "TEPE BETOPAN" appears beneath the triangles. The white background is not claimed as a feature of the mark.
Goods and Services
Sand, gravel, crushed stone for building, asphalt, bitumen, cement, gypsum as a building material for use in construction, road construction, repair and covering work; building materials as finished products, namely, concrete, gypsum, clay slabs, potters' clay, natural and artificial stone, wood boards, and plastics boards for building, construction, road construction purposes; transportable non-metallic buildings for use on the moon; poles not of metal for power lines; barriers not of metal for pedestrian traffic control on space stations; doors and windows of wood and non-metal synthetic materials for use in lunar colonies; traffic signs not of metal, non-luminous and non-mechanical, for road; monuments and statuettes of stone, concrete and marble; natural and synthetic surface coatings in the form of concrete panels and sheets, being building materials; bitumen-based cardboard sealants for roofing; bitumen-based sealants for roofing; building glass; prefabricated swimming pools not of metal; aquarium sand
Translation of Words in Mark
The English translation of "TEPE" in the mark is "hill." The wording "BETOPAN" has no meaning in a foreign language.
Classification Information
International Class
019 - Building materials (non-metallic); non-metallic rigid pipes for building; asphalt, pitch and bitumen; non-metallic transportable buildings; monuments, not of metal. - Building materials (non-metallic); non-metallic rigid pipes for building; asphalt, pitch and bitumen; non-metallic transportable buildings; monuments, not of metal.
US Class Codes
001, 012, 033, 050
Class Status Code
6 - Active
Class Status Date
2021-02-14
Primary Code
019
Current Trademark Owners
Party Type
20 - Owner at Publication
Legal Entity Type
09 - Joint Stock Company
Address
Please log in with your Justia account to see this address.
Trademark Owner History
Correspondences
Name
Dwana S. Dixon
Address
Please log in with your Justia account to see this address.
International Registrations
International Registration Number
1263272
International Registration Date
2015-06-09
International Publication Date
2021-02-04
International Renewal Date
2025-06-09
Auto Protection Date
2022-08-04
International Status
001 - Request for extension of protection established
International Status Date
2021-02-04
Priority Claimed In
False
First Refusal In
True
Trademark Events
Event Date | Event Description |
2021-02-04 | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB |
2021-02-11 | LIMITATION FROM ORIGINAL APPLICATION ENTERED |
2021-02-14 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |
2021-02-18 | APPLICATION FILING RECEIPT MAILED |
2021-07-09 | ASSIGNED TO EXAMINER |
2021-07-12 | NON-FINAL ACTION WRITTEN |
2021-07-13 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
2021-07-23 | REFUSAL PROCESSED BY MPU |
2021-07-23 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
2021-08-14 | REFUSAL PROCESSED BY IB |
2021-08-27 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
2021-08-27 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
2021-08-27 | TEAS/EMAIL CORRESPONDENCE ENTERED |
2021-08-30 | ASSIGNED TO LIE |
2021-08-30 | DATA MODIFICATION COMPLETED |
2021-10-22 | EXAMINERS AMENDMENT -WRITTEN |
2021-10-22 | EXAMINERS AMENDMENT E-MAILED |
2021-10-22 | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED |
2021-10-22 | EXAMINER'S AMENDMENT ENTERED |
2021-10-22 | APPROVED FOR PUB - PRINCIPAL REGISTER |
2021-11-10 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
2021-11-17 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
2021-11-22 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
2021-11-30 | PUBLISHED FOR OPPOSITION |
2021-11-30 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
2021-12-12 | NOTIFICATION PROCESSED BY IB |