EPOWER PIPE - Trademark Details
Status: 700 - Registered
Serial Number
79219777
Registration Number
5718460
Word Mark
EPOWER PIPE
Status
700 - Registered
Status Date
2019-04-09
Filing Date
2017-06-12
Registration Number
5718460
Registration Date
2019-04-09
Mark Drawing
3000 - Illustration: Drawing or design which also includes word(s)/ letter(s)/number(s)
Typeset
Design Searches
241504, 261701, 261705 - Arrowheads. Straight line(s), band(s) or bar(s). Horizontal line(s), band(s) or bar(s).
Published for Opposition Date
2019-01-22
Attorney Name
Law Office Assigned Location Code
N50
Employee Name
LAMONT, JOHN CHRISTOPH
Statements
Indication of Colors claimed
The color(s) green, white and black is/are claimed as a feature of the mark.
Disclaimer with Predetermined Text
"POWER PIPE"
Description of Mark
The mark consists of a geometric figure resembling an arrow and the wording "E POWER PIPE" on a white background. The arrow design is to the left of the wording "POWER" with the top half of the arrow depicted in green and the bottom half depicted in black. The letter "E" inside the arrow design is depicted in white. The wording "POWER PIPE" appears to the right of the arrow design with the top half of the letters depicted in green and the bottom half of the letters depicted in black. A narrow, angled band of white separates the point of the arrow design from the "P" in "POWER" and a narrow band of white also separates the top and bottom of the letters in "POWER PIPE".
Goods and Services
Mining machines, namely, boring machines, shaft boring machines, shaft drilling machines, and shaft sinking machines; agricultural, construction, oil and gas extraction machines; tunneling machines, namely, drilling machines for exploring for and extracting agricultural, oil and gas products and for constructing buildings; tunneling machines, namely, tunnel boring machines, tunnel excavation machines, and angle boring machines; earth moving machines
Goods and Services
Construction services, namely, constructing pipelines, tunnels, and shafts in the ground; mining extraction; mining services; tunneling services, namely, tunnel boring services and the construction and construction management of tunnels and pipelines; rental of construction equipment; rental of mining machines and apparatus; rental of construction and building equipment
Pseudo Mark
E POWER PIPE
Classification Information
International Class
007 - Machines and machine tools; motors and engines (except for land vehicles); machine coupling and transmission components (except for land vehicles); agricultural implements (other than hand-operated); incubators for eggs. - Machines and machine tools; motors and engines (except for land vehicles); machine coupling and transmission components (except for land vehicles); agricultural implements (other than hand-operated); incubators for eggs.
US Class Codes
013, 019, 021, 023, 031, 034, 035
Class Status Code
6 - Active
Class Status Date
2017-11-03
Primary Code
007
International Class
037 - Building construction; repair; installation services. - Building construction; repair; installation services.
US Class Codes
100, 103, 106
Class Status Code
6 - Active
Class Status Date
2017-11-03
Primary Code
037
Current Trademark Owners
Party Name
Party Type
30 - Original Registrant
Legal Entity Type
25
Address
Please log in with your Justia account to see this address.
Trademark Owner History
Party Name
Party Type
30 - Original Registrant
Legal Entity Type
25
Address
Please log in with your Justia account to see this address.
Party Name
Party Type
20 - Owner at Publication
Legal Entity Type
25
Address
Please log in with your Justia account to see this address.
Party Name
Party Type
10 - Original Applicant
Legal Entity Type
25
Address
Please log in with your Justia account to see this address.
Correspondences
Name
LAURENCE P. COLTON
Address
Please log in with your Justia account to see this address.
International Registrations
International Registration Number
1372646
International Registration Date
2017-06-12
International Publication Date
2017-11-02
International Renewal Date
2027-06-12
Auto Protection Date
2019-05-02
International Status
001 - Request for extension of protection established
International Status Date
2017-11-02
Priority Claimed In
True
Priority Claimed Date
2016-12-12
First Refusal In
True
Trademark Events
Event Date | Event Description |
2017-11-02 | SN ASSIGNED FOR SECT 66A APPL FROM IB |
2017-11-03 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |
2017-11-03 | ASSIGNED TO EXAMINER |
2017-11-06 | NON-FINAL ACTION WRITTEN |
2017-11-07 | APPLICATION FILING RECEIPT MAILED |
2017-11-07 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
2017-11-16 | REFUSAL PROCESSED BY MPU |
2017-11-16 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
2017-12-01 | REFUSAL PROCESSED BY IB |
2018-03-01 | NEW REPRESENTATIVE AT IB RECEIVED |
2018-05-15 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
2018-05-15 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
2018-05-22 | ASSIGNED TO LIE |
2018-05-23 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
2018-05-23 | TEAS/EMAIL CORRESPONDENCE ENTERED |
2018-06-06 | FINAL REFUSAL WRITTEN |
2018-06-06 | FINAL REFUSAL E-MAILED |
2018-06-06 | NOTIFICATION OF FINAL REFUSAL EMAILED |
2018-12-05 | TEAS REQUEST FOR RECONSIDERATION RECEIVED |
2018-12-05 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
2018-12-05 | TEAS/EMAIL CORRESPONDENCE ENTERED |
2018-12-10 | APPROVED FOR PUB - PRINCIPAL REGISTER |
2019-01-02 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
2019-01-09 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
2019-01-09 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
2019-01-22 | PUBLISHED FOR OPPOSITION |
2019-01-22 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
2019-01-25 | NOTIFICATION PROCESSED BY IB |
2019-04-03 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
2019-04-03 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
2019-04-09 | REGISTERED-PRINCIPAL REGISTER |
2019-04-19 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
2019-07-09 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
2019-07-31 | FINAL DISPOSITION PROCESSED |
2019-07-31 | FINAL DISPOSITION NOTICE SENT TO IB |
2019-08-16 | FINAL DECISION TRANSACTION PROCESSED BY IB |